Description :
Horizontal excavation service (preparation and deepening) in mechanized gold mines.
- 700 m/month of excavations (100% of the progress plan).
- Shotcrete production of 7,000 – 10,000 m2/month.
- Dual CRF fill and shotcrete plant operation.
- CRF fill production 4,000 m3/month.
- Placement of bolts and meshes.