
INCIMMET, looking for operational excellence, is certified with the highest standards in its most recent versions.
The Scope of INCIMMET’s Integrated Safety, Occupational Health, Environment and Quality Management System, based on international standards ISO 45001:2018, ISO 14001:2015, ISO 9001:2015, covers all the processes that comprise the Development Services, Preparation, Mining Operation, Cable Bolting, Blasting, Hydraulic Filling, Raise Boring, Shotcrete Preparation and thrown out, Auxiliary Services and Civil Infraestructure in Mine Undergroung Operations.
INCIMMET was founded in response to the demand for specialized services in the mining and metallurgical sector.
First project abroad: Engineering of the hydraulic backfill system in Marmato Mine (Colombia).
The service of hydraulic backfill conceptual and basic engineering is executed in Providencia Mine (Colombia).
We started mine development operations in Cerro Lindo Mine (Nexa Resources), the biggest underground mine in Peru with a production of 20,000 tpd.
We consolidated the Mine Backfill service with the contract of cemented hydraulic backfill conceptual and basic engineering in San Jose Mine (Argentina).
Conceptual and basic engineering for the Pump tailing system testing in Bonanza Mine (Nicaragua).
First contract in Raise Mining: EPC (Engineering, procurement, and construction) Raise mining for the construction of shafts in Buritica Mine.
We started mine development operations in Tambomayo (Buenaventura), gold and silver mine with a production of 2,000 tpd.
We started mine development operations in Coscuez Mine (Emeralds).
We started mine development operations in Orcopampa (Buenaventura), gold mine with a production of 2,000 tpd.
We strengthened our presence in Colombia with a new contract of EPCM cemented rock fill (CRF) for Aris Gold in Marmato Mine.
We consolidated as an underground contractor in Peru with a total progress of 3,200 meters per month.
We established our offices in Mexico and Chile as a part of our plan of regional expansion in LATAM.
First contract in Chile: To execute the Trade-off study for mine backfilling in Cachorro Project.
First contract in Ecuador: Training in explosives and blasting at Fruta del Norte mine (Lundin Gold).
Second contract in Chile: Contract in Tunneling in El Romeral project (Compañía Minera del Pacífico – CMP)
First contract in Infrastructure: Raise Mining for Central Hidroeléctrica Aures II.
We established INCIMMET BRASIL.
We are a team of professionals, who every day give ourselves to the client, by providing quality services, with high safety standards.
We focus on giving a quick response to the clients requeriments, and we are constantly looking for increasing productivity.
We belong at the mining and infrastructure sectors, and we lead three business units: Underground Mining, Open Pit Mining, and Infrastructure