• es
  • en

FOLLOW US

SANTA MARÍA

Project Details
Customer:

COMPAÑÍA MINERA PODEROSA

Status:

Project in execution

Production:

1,500 tpd

Place:

Peru

Date:

march 2023 - to the date

Service:

Infrastructure

Description:

Construction of the first 8km mechanized mining tunnel in the Santa María mine for mineral extraction in a gold mine.

  • Underground excavation of section 3.5 m x 3.9 m.
  • Wet application of shotcrete.
  • Support with helical bolts and electro-welded mesh.
  • Installation of rails and sleepers.