CERRO LINDO 1

Project Details
Project Name :

CERRO LINDO 1

Project Category :

Underground mining

Description :

Horizontal excavation service (preparation and deepening) in mechanized polymetallic mines.

  • 1,700 m/month of excavations (55% of the progress plan).
  • Underground excavation in sections of 5.0 m x 5.0 m and 5.0 m x 4.5 m.
  • Cable bolting with cabolt equipment 24,000 m/month injected.
  • Drilling with 16-foot rods and 2-arm rigs.
  • Construction of high resistance walls for 30 meter banks (long holes).
  • Placement of 12,000 bolts/month.