BURITICÁ

Project Details
Customer:

ZIJIN - CONTINENTAL GOLD

Status:

Project in Execution

Production:

4,000 tpd

Place:

Colombia

Date:

august 2018 - to the date

Service:

Underground mining

Description:

Integral services in vertical excavations with raise borer in gold mine.

    • +1,300 meters with diameters from 2.4 m to 4.1 m (first shaft of this diameter in Colombia).
    • EPC in construction of shafts and fill pass, ore pass ventilation sheds.
    • Inspection through 3D scanning and repair of shaft structure.
    • Design, manufacture and installation of electrohydraulic hoppers for unloading dumps.
    • Support with cable bolts and coating with high resistance shotcrete (60 Mpa) using the Galloway system as a construction method.