Description :
Construction of the first 8km mechanized mining tunnel in the Santa María mine for mineral extraction in a gold mine.
- Underground excavation of section 3.5 m x 3.9 m.
- Wet application of shotcrete.
- Support with helical bolts and electro-welded mesh.
- Installation of rails and sleepers.